Thursday 9 February 2012

'Justice' - production schedule - day two

On the second day – Saturday 11th Febuary, we are going to film in Hackney/Clapton Pond. We will mainly be working around the key prop – Christabell’s mum’s car and the parcel. We will be meeting at 10am and hopefully wrapping up the final day at 12.00/1.00pm




10.00am –  setting up the production
10.15am – filming Christabell’s mum’s foot walking up to the car– close up
10.30am – filming Christabell’s mum’s opening the car door
10.45am – filming Christabell’s mum’s getting into the car and putting the parcel in the back seat
11.00am –  filming Christabell’s mum putting on the radio (sound bridge to the girls ipod)
11.15am – filming Christabell’s mum looking into the reer mirrors
11.30am – filming a short from the back of the car
11.45am – a shot of Christabell’s mum looking outside the right window
12.00pm – filming some scenery to show what her mum see’s outside the window

During our filming sessions we will be taking photographs, filming vlogs of our experience on shoot. We will also be filming a wild track and foley sound at the end of each day to ensure we have some sound to put over the piece in the editing suite.



Our production schedule illustrates what we will be doing during the two days including specific times.
I made sure the schedule was as precise as it could be to ensure the day runs smoothly and we know exactly what to do at all times. Once the two days of filming are over, we plan to edit the piece on the 20th and 23rd of February. 

No comments:

Post a Comment